METHODOLOGY / PROCEDURE OF PODIUM WATERPROOFING
APPLICATION OF SOLVENT BASED
POLYURETHANE (PU) MEMBRANE ON PODIUM SLAB
STEP-1:
`SURFACE PREPARATION:
Ø
Ø The surface needs to be clean, dry and sound, free of any
contamination, which may harmfully affect the adhesion of the membrane.
Ø Maximum moisture content should not exceed 5%. Substrate
compressive strength should be at least 25 MPa, cohesive bond strength at least
1.5 MPa.
Ø New concrete structures need to dry for at least 28 days.
Old, loose coatings, dirt, fats, oils, organic substances and dust need to be
removed by a grinding machine. Possible surface irregularities need to be
smoothened.
Ø Any loose surface pieces and grinding dust need to be
thoroughly removed.
Ø WARNING: Do not wash surface with water.
Ø All surface cracks, undulations and voids must be
repaired before application using a suitable repairing material.
Ø Substrates must be surface dry prior to application.
Ø During surface preparation all fittings of drain outlets
work must be completed.
STEP-2 : PRIMING OF RCC SURFACE
Ø Prime absorbent surfaces like concrete, cement screed
with PU Primer and allow the primer to air cure according manufacturer’s
technical instruction.
Ø Allow the primer to cure for 6 – 8 Hrs to tacky condition
STEP-3 : APPLICATION OF PU MEMBRANE
Ø Stir well before using of PU solvent.
Ø Apply the PU solvent onto the primed surface and lay it
out by roller or brush, until all surface is covered.
Ø Airless spraying method can be allowed a considerable
saving of manpower.
Ø After 12-18 hours (not later than 48 hours) apply another
layer of the PU solvent.
Ø For best results, the temperature during application and
cure should be between 5ºC and 35ºC.
Ø Low temperatures retard cure while high temperature speed
up curing. High humidity may affect the final finish.
Ø The coverage shall be maintained at 1.8 Kg/sqm to achieve
Dry Film Thickness of 1.5mm.
Ø The membrane (both the coats) shall be applied over the
angle fillet and shall be extended over the vertical wall (i.e. Parapet wall )
upto height such that it is terminated at 300mm above Finish Floor Level or
Soil Filling Level.
Ø Allow the membrane to air cure for minimum 3 – 4 days
before any activity over it.
Ø Allow the coating to cure for 2 – 3 days.
STEP- 4 : PONDING TEST OF APPLIED PU MEMBRANE
(If required)
Ø
Make bund wall and fill water to pond the area as per the site
requirement and allow the water for 72Hrs.
Ø
Remove water after 72 Hrs after inspection. Allow to dry for 24 Hrs.
STEP- 5: PROTECTION OF PU MEMBRANE
(HORIZONTAL SURFACE)
Ø Provide 200 GSM
geotextile membrane over the waterproofing membrane to create a separation
layer as well as protection layer from screeding.
Ø The geotextile layer shall have 100 mm overlap and spot
bonded and shall be extended at the wall up to 100mm above the slab floor.
Ø Lay Concrete screed of minimum M20 grade concrete (RMC)
over the geotextile membrane. 12mm poly-propylene fibers at 0.9Kg/cum may be
added to avoid shrinkage cracks of concrete.
Ø Provide slope of 1:1000 or as recommended by client.
Ø The slope shall be provided in such a way that there is
40mm minimum thickness at the point of drain outlet.
Ø The screed shall be finished rough with broom and in
shape of watta / rounding at the wall and floor junctions.
Ø The screed shall be cured with water for minimum 07 to 10
days.
Ø After the screed is cured remove all the water, cut
joints in screed with grinder of 10mm wide and 25 mm deep to form panels of 4M
X 4M.
Ø Clean the joints with compressed air to make it dust free
and leave it for 1 or 2 days to remove the moisture from the joints.
Ø Pack in backer rod of round cross-section inside the
joint upto 10 mm depth left at top.
Ø This joint shall be applied with PU primer. Allow to dry
for minimum 2 – 3 Hrs to tacky condition. Then fill the joints with PU sealant.
Ø Allow the sealant
to air cure for 2 – 3 days before covering or laying of further tiles / pavers
if applicable.
STEP- 6: PROTECTION OF PU MEMBRANE (FOR
VERTICAL SURFACE SURFACE)
Ø Over the waterproofing membrane apply 2 coats of Epoxy
Bonding Agent conforming to Shear Bond strength as per ASTM C 881.
Ø Sprinkle sand over the primed surface at 2 – 3Kg/sqm when
the bonding agent is wet.
Ø Allow it to dry to form firm key for the plaster.
Ø Lay 15 to 20mm thick plaster in two coats over the
prepared surface of cement sand mortar mixed with integral waterproof compound
conforming to IS 2645-2003.
FOR LANDSCAPE PORTION (i.e. Grass & Trees
height upto 2mts):
Ø The Rolled matrix Drainage layer with filter media shall
be laid over the protection screed before soil filling as per specification of Landscape
architect / engineer.
FOR PLANTER BOXES: Separate Anti-Root Treatment above the
screed
(If Trees height is more than 2 mts.):
Ø Prime the surface with solvent based bituminous primer.
Ø Stick peel and Lay SBS modified cold applied preformed
Anti-root membrane over the primer.
Ø The overlaps shall be minimum 50 to 75 mm selvedge and self-sticking.
Ø The Rolled matrix Drainage layer with filter media shall
be laid over the protection screed before soil filling as specified by Landscape
architect / engineer.