METHODOLOGY / PROCEDURE OF PODIUM SLAB WATERPROOFING

METHODOLOGY / PROCEDURE  OF PODIUM  WATERPROOFING

 

 

APPLICATION OF SOLVENT BASED POLYURETHANE (PU) MEMBRANE ON PODIUM SLAB

 

STEP-1: `SURFACE PREPARATION:

Ø   

Ø  The surface needs to be clean, dry and sound, free of any contamination, which may harmfully affect the adhesion of the membrane.

Ø  Maximum moisture content should not exceed 5%. Substrate compressive strength should be at least 25 MPa, cohesive bond strength at least 1.5 MPa.

Ø  New concrete structures need to dry for at least 28 days. Old, loose coatings, dirt, fats, oils, organic substances and dust need to be removed by a grinding machine. Possible surface irregularities need to be smoothened.

Ø  Any loose surface pieces and grinding dust need to be thoroughly removed.

Ø  WARNING: Do not wash surface with water.

Ø  All surface cracks, undulations and voids must be repaired before application using a suitable repairing material.

Ø  Substrates must be surface dry prior to application.

Ø  During surface preparation all fittings of drain outlets work must be completed.

 

STEP-2 : PRIMING OF RCC SURFACE

Ø  Prime absorbent surfaces like concrete, cement screed with PU Primer and allow the primer to air cure according manufacturer’s technical instruction.

Ø  Allow the primer to cure for 6 – 8 Hrs to tacky condition

 

STEP-3 : APPLICATION OF PU MEMBRANE

Ø  Stir well before using of PU solvent.

Ø  Apply the PU solvent onto the primed surface and lay it out by roller or brush, until all surface is covered.

Ø  Airless spraying method can be allowed a considerable saving of manpower.

Ø  After 12-18 hours (not later than 48 hours) apply another layer of the PU solvent.

Ø  For best results, the temperature during application and cure should be between 5ºC and 35ºC.

Ø  Low temperatures retard cure while high temperature speed up curing. High humidity may affect the final finish.

Ø  The coverage shall be maintained at 1.8 Kg/sqm to achieve Dry Film Thickness of    1.5mm.

Ø  The membrane (both the coats) shall be applied over the angle fillet and shall be extended over the vertical wall (i.e. Parapet wall ) upto height such that it is terminated at 300mm above Finish Floor Level or Soil Filling Level.

Ø  Allow the membrane to air cure for minimum 3 – 4 days before any activity over it.

Ø  Allow the coating to cure for 2 – 3 days.

 

STEP- 4 : PONDING TEST OF APPLIED PU MEMBRANE (If required)

Ø  Make bund wall and fill water to pond the area as per the site requirement and allow the water for 72Hrs.

Ø  Remove water after 72 Hrs after inspection. Allow to dry for 24 Hrs.

 

STEP- 5: PROTECTION OF PU MEMBRANE (HORIZONTAL SURFACE)

 

Ø  Provide  200 GSM geotextile membrane over the waterproofing membrane to create a separation layer as well as protection layer from screeding.

Ø  The geotextile layer shall have 100 mm overlap and spot bonded and shall be extended at the wall up to 100mm above the slab floor.

Ø  Lay Concrete screed of minimum M20 grade concrete (RMC) over the geotextile membrane. 12mm poly-propylene fibers at 0.9Kg/cum may be added to avoid shrinkage cracks of concrete.

Ø  Provide slope of 1:1000 or as recommended by client.

Ø  The slope shall be provided in such a way that there is 40mm minimum thickness at the point of drain outlet.

Ø  The screed shall be finished rough with broom and in shape of watta / rounding at the wall and floor junctions.

Ø  The screed shall be cured with water for minimum 07 to 10 days.

Ø  After the screed is cured remove all the water, cut joints in screed with grinder of 10mm wide and 25 mm deep to form panels of 4M X 4M.

Ø  Clean the joints with compressed air to make it dust free and leave it for 1 or 2 days to remove the moisture from the joints.

Ø  Pack in backer rod of round cross-section inside the joint upto 10 mm depth left at top.

Ø  This joint shall be applied with PU primer. Allow to dry for minimum 2 – 3 Hrs to tacky condition. Then fill the joints with PU sealant.

Ø   Allow the sealant to air cure for 2 – 3 days before covering or laying of further tiles / pavers if applicable.

 

STEP- 6: PROTECTION OF PU MEMBRANE (FOR VERTICAL SURFACE SURFACE)

 

Ø  Over the waterproofing membrane apply 2 coats of Epoxy Bonding Agent conforming to Shear Bond strength as per ASTM C 881.

Ø  Sprinkle sand over the primed surface at 2 – 3Kg/sqm when the bonding agent is wet.

Ø  Allow it to dry to form firm key for the plaster.

Ø  Lay 15 to 20mm thick plaster in two coats over the prepared surface of cement sand mortar mixed with integral waterproof compound conforming to IS 2645-2003.

 

FOR LANDSCAPE PORTION (i.e. Grass & Trees height upto 2mts):

 

Ø  The Rolled matrix Drainage layer with filter media shall be laid over the protection screed before soil filling as per specification of Landscape architect / engineer.

 

FOR PLANTER BOXES: Separate Anti-Root Treatment above the screed

(If Trees height is more than 2 mts.):

 

Ø  Prime the surface with solvent based bituminous primer.

Ø  Stick peel and Lay SBS modified cold applied preformed Anti-root membrane over the primer.

Ø  The overlaps shall be minimum 50 to 75 mm selvedge and self-sticking.

Ø  The Rolled matrix Drainage layer with filter media shall be laid over the protection screed before soil filling as specified by Landscape architect / engineer.

1 comment:

  1. If you are searching for reliable and durable pond lining solutions, you must check out the options available in the market. One of the most common queries people have is about the hdpe pond liner price in india because cost plays a vital role in decision-making. A high-quality liner ensures long-term water retention, reduces seepage, and saves money. Always compare suppliers and choose a trusted brand offering strong, UV-stabilized liners for better results.