23. CHECKLIST FOR FIXING OF FALSE CEILING |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Flat / Floor no: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl. |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
for the safety process is followed for fixing of false ceiling. |
OK |
Not OK |
|
|
|
|
PRIOR TO FIXING OF FALSE CEILING |
|||
1 |
Check for approval of work methodology for fixing of false ceiling. |
OK |
Not OK |
2 |
Check for availability of Tool and tackles for fixing of false ceiling. |
OK |
Not OK |
3 |
Check for the Type of false ceiling to be executed. |
OK |
Not OK |
4 |
Check the shape & size of the GI sections for framing work as per
drawing. |
OK |
Not OK |
5 |
Check for type of hanging system to be executed. |
|
|
6 |
Check for the bottom level of the ceiling is marked on the wall. |
OK |
Not OK |
7 |
Check for the inspection of incoming materials w.r.t. approved
specification. |
OK |
Not OK |
8 |
Check for completion of preceding activities like electrical
installation, HVAC Installation, Plastering & Dado of walls etc. |
|
|
9 |
Check for availability of approved material. |
OK |
Not OK |
10 |
Check for the ceiling painting / white wash is completed. |
|
|
DURING FIXING OF FALSE CEILING |
|||
1 |
Check for marking of suspended ceiling level on walls as per drawing. |
OK |
Not OK |
2 |
Check for installation of wall channels as shown in shop drawings. |
OK |
Not OK |
3 |
Check for fixing of suspenders (GI section / Wire) as per
specifications. |
OK |
Not OK |
4 |
Check for the spacing of suspender & GI section as per drawing. |
|
|
5 |
Check for rigidity & alignment of framework of false ceiling. |
OK |
Not OK |
6 |
Check for fixing of panels as shown in shop drawings. |
OK |
Not OK |
7 |
Check for screw spacing as per requirement |
OK |
Not OK |
8 |
Check provision for fixing of A/C grills, electrical fittings,
sprinkler, smoke detector & trap doors etc. |
OK |
Not OK |
9 |
Check for matching of joints, closure of gaps & uniform finish. |
OK |
Not OK |
AFTER FIXING OF FALSE CEILING |
|||
1 |
Check for joints finish of ceiling panels. |
OK |
Not OK |
2 |
Check for the fixing of A/C
grills, electrical fittings, sprinkler, smoke detector & trap doors etc.
as per drawing location. |
OK |
Not OK |
3 |
|
OK |
Not OK |
Remarks: |
23. CHECKLIST FOR FIXING OF FALSE CEILING (GYPSUM BOARD/ METAL CEILING)
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
26. CHECKLIST FOR VDF / TREMIX FLOORING Name Of Project : Date of Checking: Location / Fl...
The most interesting text on this interesting topic that can be found on the net ... Equipment Rental
ReplyDeletegood...
ReplyDeletefixing sprinklers
very useful
ReplyDeleteVery Useful and Helpful Post. Thanks to Lot of Share this blog with us. Ceiling Boards
ReplyDelete