23. CHECKLIST FOR FIXING OF FALSE CEILING (GYPSUM BOARD/ METAL CEILING)

 

23. CHECKLIST FOR FIXING OF FALSE CEILING

Name Of Project :

Date of Checking:

Location / Flat / Floor no:

Drawing / Document Reference No.

 

Sl.
No.

Description / Activities / Items to be Checked

Status

1

Check for the safety process is followed for fixing of false ceiling.

OK

Not OK

 

 

 

 

PRIOR TO FIXING OF FALSE CEILING

1

Check for approval of work methodology for fixing of false ceiling.

OK

Not OK

2

Check for availability of Tool and tackles for fixing of false ceiling.

OK

Not OK

3

Check for the Type of false ceiling to be executed.
(Gypsum board ceiling / Metal ceiling / Perforated Metal ceiling)

OK

Not OK

4

Check the shape & size of the GI sections for framing work as per drawing.

OK

Not OK

5

Check for type of hanging system to be executed.
(GI section / Wire with gripe)

 

 

6

Check for the bottom level of the ceiling is marked on the wall.

OK

Not OK

7

Check for the inspection of incoming materials w.r.t. approved specification.

OK

Not OK

8

Check for completion of preceding activities like electrical installation, HVAC Installation, Plastering & Dado of walls etc.

 

 

9

Check for availability of approved material.

OK

Not OK

10

Check for the ceiling painting / white wash is completed.
(if required.)

 

 

DURING FIXING OF FALSE CEILING

1

Check for marking of suspended ceiling level on walls as per drawing.

OK

Not OK

2

Check for installation of wall channels as shown in shop drawings.

OK

Not OK

3

Check for fixing of suspenders (GI section / Wire) as per specifications.

OK

Not OK

4

Check for the spacing of suspender & GI section as per drawing.

 

 

5

Check for rigidity & alignment of framework of false ceiling.

OK

Not OK

6

Check for fixing of panels as shown in shop drawings.

OK

Not OK

7

Check for screw spacing as per requirement

OK

Not OK

8

Check provision for fixing of A/C grills, electrical fittings, sprinkler, smoke detector & trap doors etc.

OK

Not OK

9

Check for matching of joints, closure of gaps & uniform finish.

OK

Not OK

AFTER FIXING OF FALSE CEILING

1

Check for joints finish of ceiling panels.

OK

Not OK

2

Check for the  fixing of A/C grills, electrical fittings, sprinkler, smoke detector & trap doors etc. as per drawing location.

OK

Not OK

3

 

OK

Not OK

Remarks:

 