WORK METHODOLOGY / PROCEDURE OF
INSTALLATION OF MS RAILING
a. BALCONY RAILING
Ø Grade & size of the MS steel shall be finalized prior
to start of activities.
Ø The position & marking of vertical & horizontal level
shall be marked on wall as per drawing.
Ø The structural steel shall be free from the defect and
shall have a smooth finish.
Ø The materials shall be free from loose mill scale, ruts
pits or other defects affecting the strength and durability
Ø The structural member shall be installed with required
scaffolding if required.
Ø Necessary bolting or welding shall be done as per drawing.
Anchor bolts shall be fitted as per structural details (if applicable).
Ø The joints between horizontal & vertical structural
member shall be done as per Architect / structural engineer in charge.
Ø Dimension of the structural shall be checked as per
drawing prior to start erection.
Ø The erection of whole structure shall be done properly to
maintain line, level and plumb.
Ø Fabricating and installing shall be done as per drawing
and design.
Ø The height of the railing shall be considered from the
respective finished floor level as per drawing.
Ø M.S box pipe shall be used as main vertical members and handrails
or as per drawing requirement.
Ø Intermediate vertical MS plate / Strip shall be provided
as per drawing.
Ø Joint preparation shall be done properly prior to start
of jointing.
Ø Finishing of railings shall be shall be done by applying one
coat primer and two coats of oil paints etc. or as per recommendation of architect
/ structural engineer in charge.
Ø Coating and painting will be done as per specifications.
b. STAIRCASE
RAILING
Ø Grade & size of the MS steel shall be finalized prior
to start of activities.
Ø The position & marking of vertical & horizontal
level shall be marked on the staircase wall as per drawing.
Ø The position of vertical posts shall be marked as per
drawing.
Ø The structural steel shall be free from the defect and
shall have a smooth finish.
Ø The materials shall be free from loose mill scale, ruts
pits or other defects affecting the strength and durability
Ø The structural member shall be installed with required
scaffolding as per sire requirements.
Ø Necessary bolting or welding shall be done as per drawing
and specification. Anchor bolts shall be fitted as per structural details (if
applicable).
Ø The joints between horizontal & vertical structural
member shall be done as per Architect / structural engineer.
Ø Dimension of the structural shall be checked as per
drawing prior to start erection.
Ø The erection of whole structure shall be done properly to
maintain line, level and plumb.
Ø Fabricating and installing shall be done as per drawing
and design.
Ø The height of the railing shall be considered from the
respective finished floor level.
Ø Size of M.S pipe for vertical members and handrails shall
be as per approved drawing.
Ø Intermediate supports parallel to the handrail at given
distances as per drawing.
Ø Intermediate vertical members shall be provided as per
approved drawing.
Ø Base of the vertical posts shall be fixed by anchor
fastener or welding or as per drawing & specification.
Ø Finishing of railings shall be done by applying one coat primer
and two coats of oil paints etc. or as per recommendation of architect /
structural engineer in charge.
Ø Adequate slope and alignment will be provided as per
drawing.
Ø Diameter and length at structural member will be checked
before fixing.
Ø Painting and coating as per specification.