WORK METHODOLOGY / PROCEDURE OF INSTALLATION OF ALUMINIUM SLIDING WINDOW
Ø Fixing aluminum
sliding window fixing work shall be started before gypsum plaster work or as
per client recommendation/ as per practicality
Ø The window
opening shall be provided during constructing of RCC wall as shown in the
architectural drawing.
Ø Reference line
and level shall be marked nearby location to verify the level of aluminum
sliding window to be fixed.
Ø Top level marking shall be done to keep the top level of all window same or as per drawing.
Ø A reference
mark will be fixed and the level to all aluminium window will be transferred
with the help of water-level pipe or Auto level as per shop drawing.
Ø Aluminum
sliding window making and Fixing shall be done by approved Façade vendor as per
predetermined size.
Ø Before making
& fixing of aluminum sliding window, quality of all incoming materials
(i.e. Aluminium section, Glass, gasket, all hardware fittings etc.) shall be
approved as per project specification.
Ø Aluminium
frame shall be powder coated with approved RAL code as per architect.
Ø Aluminium
section cutting & frame making shall be done as per approved drawing.
Ø L type
aluminium Clit shall be provided at the corner of the aluminium sections for
assembling of the frames or as per shop drawing requirements.
Ø Slot for
water outlet shall be provided
Ø Physical
dimensions of the assembled frame shall be checked before fixing at location.
Ø Required
slot shall be provided for fixing of sliding window lock push.
Ø Drainage
outlet holes shall be provided in bottom track section.
Ø After making of frames, frames shall be fixed
at the location as per marking of the line and levels.
Ø PVC spacer
packing shall be provided at the gap between aluminium frame and the face of
RCC wall for proper alignment.
Ø Required numbers
of screw/anchor fastener shall be fixed on a side of frame for fixing of frames
with RCC wall.
Ø Aluminium
window frames shall be truly vertical with the help of plumb-bob.
Ø Before
permanently fixing the Aluminium window frames with concrete surface, the
alignment and top-level of the Aluminium window frames shall be checked
properly.
Ø After final
fixing and checking of frames, sliding shutter shall be fixed in the frame or a
single frame which ever will be possible.
Ø Required no
of rollers shall be fixed in sliding shutters before fixing of sliding shutter.
All roller shall be as per design requirement.
Ø After final
fixing and checking of aluminium window frame and shutter, backer rod shall be
provided in the gap all around window frames from both side of the frame. At
least 10 mm deep gap shall be maintain around the frame for silicon fixing.
Ø Section
shall be as per drawing/specification. Track will be checked as per drawing.
Ø After
providing of backer rod, the gap shall be filled with silicon.
Ø Abro masking
tape shall be provided around the frame as well as on wall to protect the
exposed surface from silicon contact.
Ø After the
silicon have dried, temporarily provided abro masking tape shall be removed and
any other marks of silicon on aluminium frames shall be removed and cleaned.
Ø Window shall
be defect free and functioning will be proper.