14. CHECKLIST FOR BLOCK / BRICK MASONRY WORK (AAC / CONCRETE BLOCK / BRICK WORK)

 

 

14. CHECKLIST FOR BLOCK / BRICK MASONRY WORK
(AAC / CONCRETE BLOCK / BRICK WORK)

Name Of Project :

Date of Checking:

Location / Grid no:

Drawing / Document Reference No.

 

Sl.
No.

Description / Activities / Items to be Checked

Status

1

Check the safety process is followed for the activities.

OK

Not OK

PRIOR TO MASONRY WORK

2

Check for approval of work methodology for masonry work

OK

Not OK

3

Check for Suitability & Safety of Scaffolding for masonry work

OK

Not OK

4

Check for availability of Tool and tackles for masonry work.

OK

Not OK

5

Check for approval of material to be used for masonry work

OK

Not OK

6

Check for availability of materials for masonry work

OK

Not OK

7

Check for cleanliness of concrete surface where block work to be executed

OK

Not OK

8

Check for hacking is done on RCC surface / application of bonding agent at joint of RCC and masonry work

OK

Not OK

9

Check for mix proportion of Cement mortar / Ready mix mortar / Block jointing mortar

OK

Not OK

10

Check for Moisturing of Masonry Blocks / Bricks before placing.

OK

Not OK

11

Check for laying of DPC course before staring of Masonry work

OK

Not OK

DURING MASONRY WORK

12

Check for laying of mortar bedding on DPC before first layer of block.

OK

Not OK

13

Check for the Alignment & Location of Block Masonry as specified in the Construction Drawings

OK

Not OK

14

Check for the joint thickness of masonry work

OK

Not OK

15

Check for Dimension, plumb and level of masonry work

OK

Not OK

16

Check for Staggering of vertical joints of masonry work

OK

Not OK

17

Size for opening of doors and windows

OK

Not OK

18

Check for the dimensions of masonry work as per drawing

OK

Not OK

19

Check for sizes of doors & windows openings

OK

Not OK

20

Check for location of mullion and bend beam are provided as per drawing

OK

Not OK

21

Check for racking of joints to receive plastering or pointing (both sides of wall)

OK

Not OK

22

Check for provision of MEP services as per drawing.

OK

Not OK

23

Check for metal packing at the top of masonry wall / below RCC beam bottom

OK

Not OK

24

Check for curing arrangements

OK

Not OK

25

OK

Not OK

AFTER MASONRY WORK

26

Check for curing is being done properly.

OK

Not OK

27

Check all mortar joints are raked and cleaned.

OK

Not OK

28

Check that all flatwork has been cleaned and is scraped free of mortar splatters.

OK

Not OK

29

Check all waste block and mortar has been piled in designated trash area.

OK

Not OK

30

 

OK

Not OK

Remark:

 