1. CHECKLIST FOR SITE CLEARANCE & SITE SURVEY |
|||
|
Name Of Project : |
|||
|
Location / Grid no: |
|||
|
Date of Execution: |
|||
|
Drawing / Document
Reference No. |
|||
|
Soil Investigation
/ Test Report Ref. No: |
|||
|
|
|||
|
Sl.No. |
Description / Activities / Items to be Checked |
Status |
|
|
SITE CLEARANCE |
|||
|
1 |
Check for
Sanctioned layout plan matches with the actual boundaries of the plots. |
OK |
Not OK |
|
2 |
Check for the
Initial level survey is conducted and survey record maintained. |
OK |
Not OK |
|
3 |
Check for
Permissions taken from concerned local authorities for shifting of utility
lines, other structures, cutting / transplant of trees. |
OK |
Not OK |
|
4 |
Check for Shifting
of utility lines, demolition of old structures and cutting / transplant of
trees are completed. |
OK |
Not OK |
|
5 |
Check for
Unsuitable materials removed and stacked properly. |
OK |
Not OK |
|
6 |
Check for the
disposal of removed unsuitable materials are done as per legal procedure. |
OK |
Not OK |
|
7 |
Check for
Identification, marking of transplantation of trees. |
OK |
Not OK |
|
8 |
Check for the
proper cleaning of unsuitable materials from the proposed construction area. |
OK |
Not OK |
|
9 |
Check for the
proper access to the site. |
OK |
Not OK |
|
10 |
Check for the outer
line of the site is demarcated. |
OK |
Not OK |
|
SURVEYING |
|||
|
1 |
Check for the
calibration of the survey instrument done. |
OK |
Not OK |
|
2 |
Check for the marking
of outer boundary of the site. |
OK |
Not OK |
|
3 |
Check for the road
map and Topography survey is available |
OK |
Not OK |
|
4 |
Check for the
Setting out Drawings are available |
OK |
Not OK |
|
5 |
Installation of
following points need to be check |
OK |
Not OK |
|
6 |
Mark the location
of existing interference like; Pipelines, Cable/Duct, Sewers |
OK |
Not OK |
|
7 |
|
OK |
Not OK |
|
Remark: |
|||
1. CHECKLIST FOR SITE CLEARANCE & SITE SURVEY
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
14. CHECKLIST FOR BLOCK / BRICK MASONRY WORK (AAC / CONCRETE BLOCK / BRICK WORK) Name Of Project : ...
No comments:
Post a Comment