21. CHECKLIST FOR FIXING OF ALUMINIUM SLIDING WINDOWS

 

21. CHECKLIST FOR FIXING OF ALUMINIUM SLIDING WINDOWS

Name Of Project :

Date of Checking:

Location / Flat / Floor no:

Drawing / Document Reference No.

 

Sl.
No.

Description / Activities / Items to be Checked

Status

1

Check for the safety process is followed for fixing of Aluminium Sliding Window.

OK

Not OK

 

 

 

 

PRIOR TO FIXING OF ALUMINIUM SECTION

1

Check for approval of work methodology for fixing of aluminium sliding Window.

OK

Not OK

2

Check for availability of Tool and tackles for fixing of aluminium sliding Window.

OK

Not OK

3

Check for the grade of aluminium section is used as per specification.

OK

Not OK

4

Check the shape & size of the aluminium sections are cut as per drawing.

OK

Not OK

5

Check for the top level of the aluminium sliding Window is marked on the wall.

OK

Not OK

6

Check for the inspection of incoming materials w.r.t.  Specification.

OK

Not OK

7

Check for the coating of aluminium section is done as per the approved shade.

OK

Not OK

8

Check for the protection of coated aluminium section is done.

OK

Not OK

DURING FIXING OF ALUMINIUM SECTION.

1

Check for the Section type is used. (2 track / 3 track)

OK

Not OK

2

Check the plumb of the window frame w.r.t. opening.

OK

Not OK

3

Check for the L clip is used at corner of the sections for proper assembling.

OK

Not OK

4

Check for PVC packing is used for packing / aligning of window frames.

OK

Not OK

5

Check for proper fastening of window frames/sub frame to walls by screws.

OK

Not OK

6

Check for no of screws are fixed as per drawing.

OK

Not OK

7

Check for dimension of the frames before final screwing of aluminium Frames.

OK

Not OK

8

Check for fixing of glass shutter as per required size.

OK

Not OK

9

Check for the thickness, brand & types of glass is used for window shutters.

OK

Not OK

10

Check for the fixing of the hardware fittings as per drawing.

OK

Not OK

AFTER FIXING OF SLIDING WINDOW

1

Check for the proper functioning of hardware fittings Like; Hinges, Roller, Handles, Locks, EPDM gaskets, etc.

OK

Not OK

2

Check for overall satisfactory functioning   of Windows.

OK

Not OK

3

Check for removal of protective coating & cleaning of the aluminium window before handing over.

OK

Not OK

4

Check for the fixing of backer rod on periphery of the aluminium section before application of Sealant.

OK

Not OK

5

Check for the water leakage test of the window. (if required)

OK

Not OK

Remarks:

 