21. CHECKLIST FOR FIXING OF ALUMINIUM SLIDING
WINDOWS |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Flat / Floor no: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl. |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
for the safety process is followed for fixing of Aluminium Sliding Window. |
OK |
Not OK |
|
|
|
|
PRIOR TO FIXING OF ALUMINIUM SECTION |
|||
1 |
Check for approval of work methodology for fixing of aluminium sliding
Window. |
OK |
Not OK |
2 |
Check for availability of Tool and tackles for fixing of aluminium
sliding Window. |
OK |
Not OK |
3 |
Check for the grade of aluminium section is used as per specification. |
OK |
Not OK |
4 |
Check the shape & size of the aluminium sections are cut as per
drawing. |
OK |
Not OK |
5 |
Check for the top level of the aluminium sliding Window is marked on
the wall. |
OK |
Not OK |
6 |
Check for the inspection of incoming materials w.r.t. Specification. |
OK |
Not OK |
7 |
Check for the coating of aluminium section is done as per the approved
shade. |
OK |
Not OK |
8 |
Check for the protection of coated aluminium section is done. |
OK |
Not OK |
DURING FIXING OF ALUMINIUM SECTION. |
|||
1 |
Check for the Section type is used. (2 track / 3 track) |
OK |
Not OK |
2 |
Check the plumb of the window frame w.r.t. opening. |
OK |
Not OK |
3 |
Check for the L clip is used at corner of the sections for proper
assembling. |
OK |
Not OK |
4 |
Check for PVC packing is used for packing / aligning of window frames. |
OK |
Not OK |
5 |
Check for proper fastening of window frames/sub frame to walls by
screws. |
OK |
Not OK |
6 |
Check for no of screws are fixed as per drawing. |
OK |
Not OK |
7 |
Check for dimension of the frames before final screwing of aluminium
Frames. |
OK |
Not OK |
8 |
Check for fixing of glass shutter as per required size. |
OK |
Not OK |
9 |
Check for the thickness, brand & types of glass is used for window
shutters. |
OK |
Not OK |
10 |
Check for the fixing of the hardware fittings as per drawing. |
OK |
Not OK |
AFTER FIXING OF SLIDING WINDOW |
|||
1 |
Check for the proper functioning of hardware fittings Like; Hinges,
Roller, Handles, Locks, EPDM gaskets, etc. |
OK |
Not OK |
2 |
Check for overall satisfactory functioning of Windows. |
OK |
Not OK |
3 |
Check for removal of protective coating & cleaning of the
aluminium window before handing over. |
OK |
Not OK |
4 |
Check for the fixing of backer rod on periphery of the aluminium
section before application of Sealant. |
OK |
Not OK |
5 |
Check for the water leakage test of the window. (if required) |
OK |
Not OK |
Remarks: |
21. CHECKLIST FOR FIXING OF ALUMINIUM SLIDING WINDOWS
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
14. CHECKLIST FOR BLOCK / BRICK MASONRY WORK (AAC / CONCRETE BLOCK / BRICK WORK) Name Of Project : ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
Torn between POP and gypsum for your false ceiling? Learn about their differences, installation advantages, and design possibilities to decide what is best for your home.
ReplyDeletePOP vs Gypsum False Ceilings: A Complete Comparison
False ceilings add to the aesthetic appeal while concealing wiring and ducts. Let's see how POP and gypsum compare
Both POP and gypsum possess distinct benefits based on your intended design. At Quartier Studio, we assist homeowners in choosing the ideal false ceiling material for durability, beauty, and functionality.
Read More:- https://quartierinterior.com/pop-and-gypsum-false-ceiling/