3. CHECKLIST FOR SOIL EXCAVATION & FILLING

 

3. CHECKLIST FOR SOIL EXCAVATION & FILLING

Name Of Project :

Location / Grid no:

Date of Execution:

Drawing / Document Reference No.

Soil Investigation / Test Report Ref. No:

 

S.No.

Description / Activities / Items to be Checked

Status

1

Check Excavation Plan prepared and approved by Client / consultant

OK

Not OK

2

Check Setting Out and Levels Established and other survey work done as per Drawing

OK

Not OK

3

Checked for underground utilities.

OK

Not OK

4

Check Safe better slop/Ground support plan established with conform no effect on adjacent works.

OK

Not OK

5

Is layout, alignment and size of excavation marked on ground as per excavation plan?

OK

Not OK

6

Check for dewatering arrangements

OK

Not OK

7

Check area identified for disposal of excavated soil

OK

Not OK

Filling

1

Check that protective coating to foundation is carried out and curing time is completed.

OK

Not OK

2

Check water-proofing to structures, if applicable is carried out as per specification.

OK

Not OK

3

Check base is clean and free of stones and debris.

OK

Not OK

4

Check necessary demarcation for base line and Temporary Bench Mark (TBM) is established for reference level.

OK

Not OK

5

Check the approval of soil to be used for filling.

OK

Not OK

6

Check availability of suitable compacting equipment is available.

OK

Not OK

7

Check necessary level demarcation is made for layer wise filling.

OK

Not OK

8

Check and ensure placement of fill in layer of 200 mm maximum and each layer is well compacted.

OK

Not OK

9

Check field compaction test where applicable was conducted and recorded.

OK

Not OK

Remark:

 