15. CHECKLIST FOR PLASTER WORK (CEMENT MORTAR) |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Grid no: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl. |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
for the safety process is followed for plaster activities. |
OK |
Not OK |
PRIOR TO PLASTER WORK |
|||
2 |
Check for approval of work methodology for plaster work |
OK |
Not OK |
3 |
Check for Suitability & Safety of Scaffolding for plaster work |
OK |
Not OK |
4 |
Check for availability of Tool and tackles for plaster work |
OK |
Not OK |
5 |
Check for approval of material to be used for plaster work. |
OK |
Not OK |
6 |
Check for availability of materials for plaster work. |
OK |
Not OK |
7 |
Check for cleanliness of concrete / masonry surface where plaster work
to be executed |
OK |
Not OK |
8 |
Check for hacking is done on RCC surface / application of bonding
agent on RCC surface. |
OK |
Not OK |
9 |
Check for Moisturing of Masonry surface before plastering. |
OK |
Not OK |
10 |
Check for fixing of GI / Fibre mesh at the joint of RCC & masonry
work. |
OK |
Not OK |
11 |
Check for fixing of Door & Window frames and it's protection |
OK |
Not OK |
12 |
Check for the level pads |
OK |
Not OK |
13 |
Check for completion of MEP activities before start of Plastering. |
OK |
Not OK |
14 |
Check for proper protection of MEP items before start of Plastering
activities. |
OK |
Not OK |
15 |
|
OK |
Not OK |
DURING PLASTER WORK |
|||
16 |
Check for mix proportion of Cement mortar / Ready mix mortar |
OK |
Not OK |
17 |
Check for addition of waterproofing compound, if required. |
OK |
Not OK |
18 |
Check for true level surface, right angle, plumb, edge, sharp corners. |
OK |
Not OK |
19 |
Check for architectural features like grooves, bands etc. |
OK |
Not OK |
20 |
Check for Waviness of plastered surface. |
OK |
Not OK |
21 |
Check for Straightness of Edges of plaster surface. |
OK |
Not OK |
22 |
Check for Right Angles & Plumb of plaster surface. |
OK |
Not OK |
23 |
|
OK |
Not OK |
AFTER PLASTERING |
|||
24 |
Check for Removal of Dead Mortar and Debris |
OK |
Not OK |
25 |
Check Date of Plastering is marked on the surface. |
OK |
Not OK |
26 |
Check for Curing arrangements |
OK |
Not OK |
27 |
Check for cleanliness of MEP items, door & window frames, etc. |
OK |
Not OK |
Remark: |
15. CHECKLIST FOR PLASTER WORK FOR INTERNAL & EXTERNAL (CEMENT MORTAR)
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
26. CHECKLIST FOR VDF / TREMIX FLOORING Name Of Project : Date of Checking: Location / Fl...