10. CHECKLIST FOR CHEMICAL WATERPROOFING WITH BRICK BAT

 

10. CHECKLIST FOR CHEMICAL WATERPROOFING

WITH BRICK BAT

Name Of Project :

Date of Checking:

Location / Structure:

Drawing / Document Reference No.

 

Sl.
No.

Description / Activities / Items to be Checked

Status

1

Check for the safety process is followed for waterproofing activities.

OK

Not OK

2

Check for approval of work methodology of waterproofing

OK

Not OK

3

Check for approval of Waterproofing system and Chemicals to be used.

OK

Not OK

PRIOR TO CHEMICAL COATING

1

Check for Cleaning of bare slab like removal and cleaning of oil, grease, dead concrete / mortar, dust, any exposed steel, wood pieces, etc.

OK

Not OK

2

Check for Ponding test to be done for 24 hours to find any leakages

OK

Not OK

3

Check for nozzle grouting is done by using of integral waterproof compound with cement slurry if any leakage is observed during Pond test.

OK

Not OK

4

Check for the making of corner batta / hunch filling by cement mortar with mixing of integral waterproofing chemicals.

OK

Not OK

5

Check for availability of material and tools as per procedure /method statement.

OK

Not OK

DURING APPLICATION OF WP CHEMICALS

1

Check and ensured that slab cleaned from dust and other particles

OK

Not OK

2

Check Mixing of polymer base Chemical and cement with proper proportions by mechanical stirrer as per manufacturer guidelines before ready to use on substrate.

OK

Not OK

3

Check application of 1 st coat of polymer base chemical on substrate as per manufacturer guidelines.

OK

Not OK

4

Check application of 2 nd coat or subsequent coat after 4hrs perpendicular in the direction of 1st coat.

OK

Not OK

5

Check chemical application minimum up to the required height as per project specification.

OK

Not OK

6

Check for the consumption of chemicals as per methodology.

OK

Not OK

7

Check Sprinkling of sand over the 2nd coat of chemical for mechanical bonding with protection coat of plaster.

OK

Not OK

AFTER APPLICATION OF WP CHEMICAL

1

Check Pond Test for 48hrs after drying chemical coat.

OK

Not OK

2

Ensure no leakage & damage on waterproof surface

OK

Not OK

DURING BRICK BAT

1

Laying 15-20mm thick cement sand mortar of 1: and admixed with integral waterproofing compound @200ml/bag of cement or as per manufacturer’s guidelines as a base mortar for Brickbats

OK

Not OK

2

Ensure laying min.75mm thick brick bats of varying sizes over the mortar in a gradient of 1:150 with varying thickness as per site condition.

OK

Not OK

3

Is the Brick bats pre-wetted before laying

OK

Not OK

4

Is the minimum half portion of brickbats should be immersed in mortar and staggered joint between two brickbats

OK

Not OK

AFTER BRRICK BAT

1

Check the curing for 7days

 

 

2

 

 

 

REMARKS:

 


1 comment:

  1. Nice Blog! Are you looking for terrace waterproofing in Panchkula? We provide top-quality waterproofing services at a reasonable price. We provide customer satisfaction with our waterproofing services. We provide 100% permanent solutions for terraces and 24*7 available for our customers. Our well-qualified team uses different methods and technology for waterproofing work.