26. CHECKLIST FOR VDF / TREMIX FLOORING |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Flat / Floor no: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl. |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
for the safety process is followed for Painting activities. |
OK |
Not OK |
PRIOR TO VDF /
TREMIX |
|||
1 |
Check for approval of work methodology of VDF / Tremix flooring. |
OK |
Not OK |
2 |
Check for availability of Tool and tackles for VDF / Tremix flooring. |
OK |
Not OK |
3 |
Check for approval of Concrete for VDF / Tremix flooring. |
OK |
Not OK |
4 |
Check for location of construction
& expansion joints w.r.t. grid lines |
OK |
Not OK |
5 |
Check for cleanliness of area to be concreted. |
OK |
Not OK |
6 |
Check for the stability and rigidity of Formwork Supports. (i.e. M.S. ISMC) |
OK |
Not OK |
7 |
Check for rigidity, alignment, level, sealing of joints |
OK |
Not OK |
8 |
Covers for reinforcement (in mm),mesh size, diameter and cover (if
required) |
OK |
Not OK |
9 |
Check for provision of raceways, waterlines etc, and prior to
concreting. |
OK |
Not OK |
10 |
Check for requirement of addition of floor hardener in concrete
wherever required as per parking and drive area. |
OK |
Not OK |
11 |
Check for Mode of concrete pouring is proposed |
|
|
12 |
Quantity of concrete poured |
|
|
13 |
Starting time of concreting |
|
|
14 |
Grade of Concrete |
|
|
DURING VDF / TREMIX |
|||
1 |
Check for slump of the concrete as specified. |
OK |
Not OK |
2 |
Check and ensure proper vibration & compaction of concrete. |
OK |
Not OK |
3 |
Check and ensure the top level of concrete surface as per drawing. |
OK |
Not OK |
4 |
Check for vacuum dewatering is done properly as specifications. |
OK |
Not OK |
5 |
Check for Power float finish is up to the mark. |
OK |
Not OK |
AFTER VDF / TREMIX |
|||
1 |
Check for curing arrangements |
OK |
Not OK |
2 |
Check for groove cutting is done as per requirement. |
OK |
Not OK |
3 |
Check for the surface finish of the floor. |
OK |
Not OK |
4 |
Check for finished level of concrete is as per the drawing. |
OK |
Not OK |
5 |
Check for sealing of joint groves with approved filler material. |
OK |
Not OK |
Remarks: |
26. CHECKLIST FOR VDF / TREMIX FLOORING
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
26. CHECKLIST FOR VDF / TREMIX FLOORING Name Of Project : Date of Checking: Location / Fl...