17. CHECKLIST FOR TILING WORK |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Flat / Floor no: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl. |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
for the safety process is followed for tiling activities. |
OK |
Not OK |
PRIOR TO TILLING WORK |
|||
1 |
Check for approval of work methodology for Tilling work |
OK |
Not OK |
2 |
Check for availability of Tool and tackles for Tiling work |
OK |
Not OK |
3 |
Check for approval of tile pattern and shade is approved from client
or consultant. |
OK |
Not OK |
4 |
Check for cleanliness of base surface. No loose mortar, dead concrete
on the floor. |
OK |
Not OK |
5 |
Check for completion of preceding activities Like; fixing of doors
frames, electrical boxes, plumbing & fire fighting pipes, HVAC, raceways,
etc. |
OK |
Not OK |
6 |
Check for fixing of Level Pads.( both horizontal & vertical
surface) |
OK |
Not OK |
7 |
Check whether application is by Ordinary Cement mortar or Tile
adhesive for tile fixing. |
OK |
Not OK |
8 |
Check for size, alignment & level of panels is as per drawing. |
OK |
Not OK |
9 |
Check for the marking of start point of tiling work. |
OK |
Not OK |
DURING TILING WORK |
|||
1 |
Check for proportion of cement mortar mix |
OK |
Not OK |
2 |
Check for the proper mixing of Tile adhesive as per manufacturer guideline. |
OK |
Not OK |
3 |
Check for thickness of mortar bed as per the drawings or required
level. |
OK |
Not OK |
4 |
Check for the fixing over mortar bed with thick Cement Slurry |
OK |
Not OK |
5 |
Check for the Pattern of laying |
OK |
Not OK |
6 |
Check for the Thickness of joints between Tiles (mm) |
OK |
Not OK |
7 |
Check for the Slope as per drawing |
OK |
Not OK |
8 |
Check for the true level surface w.r.t level. |
OK |
Not OK |
9 |
Check for the Matching of tile joints with no lipage / offset. |
OK |
Not OK |
10 |
Check for the Finishing of edges for cut tiles |
OK |
Not OK |
11 |
Check for cleaning of tile joints |
OK |
Not OK |
12 |
Check the top surface of under layer rough enough to ensure proper adhesion |
OK |
Not OK |
AFTER TILING |
|||
1 |
Check for cleaning of tile joints |
OK |
Not OK |
2 |
Check for the filling of approved tile grout at the tile joints |
OK |
Not OK |
3 |
Check for cleaning and protection of tile surface. |
OK |
Not OK |
4 |
Check for curing arrangements and sufficiency of curing. |
OK |
Not OK |
5 |
|
OK |
Not OK |
Remarks: |
17. CHECKLIST FOR TILING WORK
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
26. CHECKLIST FOR VDF / TREMIX FLOORING Name Of Project : Date of Checking: Location / Fl...
No comments:
Post a Comment