7. CHECKLIST FOR CONCRETING WORK

 

7. CHECKLIST FOR CONCRETING WORK

Name Of Project :

Date of Checking:

Location / Grid no:

Drawing / Document Reference No.

 

Sl.No

Description / Activities / Items to be Checked

Status

1

Check the safety process is followed for concreting work.

OK

Not OK

PRIOR TO CONCRETE

2

Check shuttering and reinforcement activities are completed.

OK

Not OK

3

Check the concrete mix design of required grade is approved.

OK

Not OK

4

Check the MEP activities are completed prior to concrete pour.

OK

Not OK

5

Check the location of construction joint & Expansion is provided as per drawing.

OK

Not OK

6

Check the pour plan of concreting pouring

OK

Not OK

7

Check the availability of required mechanical equipment and all are in working condition.

OK

Not OK

8

Check for availability of rain protection arrangement (If required)

OK

Not OK

9

Check for availability of material and manpower for Concreting

OK

Not OK

10

Check the availability of sufficient no. of cube moulds, slump cone and other required quality apparatus?

OK

Not OK

11

Check for top level of concrete is marked as per required level.

OK

Not OK

12

Check Mode of concreting proposed(Mixer m/c.,Batching Plant, RMC) :

OK

Not OK

13

Grade of concrete :

 

14

Total quantity of concrete :

 

DURING CONCRETING

14

Check for whether the methodology of concreting is approved

OK

Not OK

15

Check for the workability of Concrete Like; Slum / Flow

OK

Not OK

16

Check for Temperature of concrete in case of temperature controlled concrete

OK

Not OK

17

Check concrete is consumed within the retention period.

OK

Not OK

18

Check vibration is being done properly.

OK

Not OK

19

Check for top level of concrete is finished properly.

OK

Not OK

20

Check water sprinkling is being done if required.

OK

Not OK

21

Check shear key is provided for further lift / layer of concrete

OK

Not OK

AFTER CONCRETING

22

Check for proper curing arrangement is done.

OK

Not OK

23

Check for insert plates are within the required location and exposed properly

OK

Not OK

24

Check MEP cut outs are within the required location

OK

Not OK

25

Check line,  level & Dimension of the concrete is maintained as per drawing requirement

OK

Not OK

26

Check for the date of casting is mentioned on concrete surface after deshuttering.

OK

Not OK

27

Check for  Defects on Exposed Concrete like; Honeycombing, bulging, Exposed reinforcement, etc.

OK

Not OK

28

Check if casting date is marked on the structural elements

OK

Not OK

29

Check for proper rectification of concrete surface defects

OK

Not OK

30

check curing done at least for 7 days

OK

Not OK

31

Any other:

OK

Not OK

Remark:


 