7. CHECKLIST FOR CONCRETING WORK |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Grid no: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl.No |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
the safety process is followed for concreting work. |
OK |
Not OK |
PRIOR TO CONCRETE |
|||
2 |
Check shuttering and reinforcement activities are completed. |
OK |
Not OK |
3 |
Check the concrete mix design of required grade is approved. |
OK |
Not OK |
4 |
Check the MEP activities are completed prior to concrete pour. |
OK |
Not OK |
5 |
Check the location of construction joint & Expansion is provided
as per drawing. |
OK |
Not OK |
6 |
Check the pour plan of concreting pouring |
OK |
Not OK |
7 |
Check the availability of required mechanical equipment and all are in
working condition. |
OK |
Not OK |
8 |
Check for availability of rain protection arrangement (If required) |
OK |
Not OK |
9 |
Check for availability of material and manpower for Concreting |
OK |
Not OK |
10 |
Check the availability of sufficient no. of cube moulds, slump cone
and other required quality apparatus? |
OK |
Not OK |
11 |
Check for top level of concrete is marked as per required level. |
OK |
Not OK |
12 |
Check Mode of concreting proposed(Mixer m/c.,Batching Plant, RMC) : |
OK |
Not OK |
13 |
Grade of concrete : |
|
|
14 |
Total quantity of concrete : |
|
|
DURING CONCRETING |
|||
14 |
Check for whether the methodology of concreting is approved |
OK |
Not OK |
15 |
Check for the workability of Concrete Like; Slum / Flow |
OK |
Not OK |
16 |
Check for Temperature of concrete in case of temperature controlled
concrete |
OK |
Not OK |
17 |
Check concrete is consumed within the retention period. |
OK |
Not OK |
18 |
Check vibration is being done properly. |
OK |
Not OK |
19 |
Check for top level of concrete is finished properly. |
OK |
Not OK |
20 |
Check water sprinkling is being done if required. |
OK |
Not OK |
21 |
Check shear key is provided for further lift / layer of concrete |
OK |
Not OK |
AFTER CONCRETING |
|||
22 |
Check
for proper curing arrangement is done. |
OK |
Not OK |
23 |
Check for insert plates are within the required location and exposed
properly |
OK |
Not OK |
24 |
Check MEP cut outs are within the required location |
OK |
Not OK |
25 |
Check line, level &
Dimension of the concrete is maintained as per drawing requirement |
OK |
Not OK |
26 |
Check for the date of casting is mentioned on concrete surface after
deshuttering. |
OK |
Not OK |
27 |
Check for Defects on
Exposed Concrete like; Honeycombing, bulging, Exposed reinforcement, etc. |
OK |
Not OK |
28 |
Check if casting date is marked on the structural elements |
OK |
Not OK |
29 |
Check for proper rectification of concrete surface defects |
OK |
Not OK |
30 |
check curing done at least for 7 days |
OK |
Not OK |
31 |
Any other: |
OK |
Not OK |
Remark: |
7. CHECKLIST FOR CONCRETING WORK
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-