24. CHECKLIST FOR INTERNAL PAINTING

 

24. CHECKLIST FOR INTERNAL PAINTING

Name Of Project :

Date of Checking:

Location / Flat / Floor no:

Drawing / Document Reference No.

 

Sl.
No.

Description / Activities / Items to be Checked

Status

1

Check for the safety process is followed for Painting activities.

OK

Not OK

PRIOR TO PAINTING

1

Check for approval of work methodology of internal painting.

OK

Not OK

2

Check for availability of Tool and tackles for internal painting.

OK

Not OK

3

Check for Suitability & Safety of Scaffolding for internal painting.

OK

Not OK

4

Check for the availability of approved manufacturer's specifications for painting activities.

OK

Not OK

5

Check for the approved mock-up of process & shade code.

OK

Not OK

6

Check for the surface is free from dead mortar / gypsum, dust, oil, grease, etc.

OK

Not OK

7

Check for the grouting of tie patti / tie rod holes before painting.

OK

Not OK

8

Check for proper protection of MEP fittings, Floors, doors & windows before start of painting activities to avoid paint stain.

OK

Not OK

9

Check for the proper sanding of Plaster / gypsum plaster surface before applying of Putty.

OK

Not OK

10

Check the surface is properly wet (in case of cement paint).

OK

Not OK

DURING PAINTING

1

Check for the proper application of Primer on plaster surface before putty (if required).

OK

Not OK

2

Check for the proper mixing of Putty as per manufacturer guidelines.

OK

Not OK

3

Check for the putty is applied uniformly on plaster surface.

OK

Not OK

4

Check for the sanding of putty surface before applying primer.

OK

Not OK

5

Check for the 1st coat primer is applied evenly / uniformly as per requirements.

OK

Not OK

6

Check for the proper mixing of paint as per manufacturer guidelines.

OK

Not OK

7

Check for proper application of 1st coat paint as per manufacturer guidelines.

OK

Not OK

8

Check for proper application of 2nd coat paint as per manufacturer guidelines.

OK

Not OK

9

Check for time gape between 1st coat and 2nd coat of paint as per manufacturer guidelines.

OK

Not OK

10

Check for the uniform thickness of paint application.

OK

Not OK

AFTER PAINTING

1

Check for any patch mark is visible on painted surface.

OK

Not OK

2

Check for any sagging of paint on painted surface.

OK

Not OK

3

Check surrounding surface properly cleaned and finished from paint stains.

OK

Not OK

4

Remove all the protection tapes which were provided before painting

OK

Not OK

5

 

OK

Not OK

Remarks:

 