24. CHECKLIST FOR INTERNAL PAINTING |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Flat / Floor no: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl. |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
for the safety process is followed for Painting activities. |
OK |
Not OK |
PRIOR TO PAINTING |
|||
1 |
Check for approval of work methodology of internal painting. |
OK |
Not OK |
2 |
Check for availability of Tool and tackles for internal painting. |
OK |
Not OK |
3 |
Check for Suitability & Safety of Scaffolding for internal
painting. |
OK |
Not OK |
4 |
Check for the availability of approved manufacturer's specifications
for painting activities. |
OK |
Not OK |
5 |
Check for the approved mock-up of process & shade code. |
OK |
Not OK |
6 |
Check for the surface is free from dead mortar / gypsum, dust, oil,
grease, etc. |
OK |
Not OK |
7 |
Check for the grouting of tie patti / tie rod holes before painting. |
OK |
Not OK |
8 |
Check for proper protection of MEP fittings, Floors, doors &
windows before start of painting activities to avoid paint stain. |
OK |
Not OK |
9 |
Check for the proper sanding of Plaster / gypsum plaster surface
before applying of Putty. |
OK |
Not OK |
10 |
Check the surface is properly wet (in case of cement paint). |
OK |
Not OK |
DURING PAINTING |
|||
1 |
Check for the proper application of Primer on plaster surface before
putty (if required). |
OK |
Not OK |
2 |
Check for the proper mixing of Putty as per manufacturer guidelines. |
OK |
Not OK |
3 |
Check for the putty is applied uniformly on plaster surface. |
OK |
Not OK |
4 |
Check for the sanding of putty surface before applying primer. |
OK |
Not OK |
5 |
Check for the 1st coat primer is applied evenly / uniformly as per
requirements. |
OK |
Not OK |
6 |
Check for the proper mixing of paint as per manufacturer guidelines. |
OK |
Not OK |
7 |
Check for proper application of 1st coat paint as per manufacturer
guidelines. |
OK |
Not OK |
8 |
Check for proper application of 2nd coat paint as per manufacturer
guidelines. |
OK |
Not OK |
9 |
Check for time gape between 1st coat and 2nd coat of paint as per
manufacturer guidelines. |
OK |
Not OK |
10 |
Check for the uniform thickness of paint application. |
OK |
Not OK |
AFTER PAINTING |
|||
1 |
Check for any patch mark is visible on painted surface. |
OK |
Not OK |
2 |
Check for any sagging of paint on painted surface. |
OK |
Not OK |
3 |
Check surrounding surface properly cleaned and finished from paint
stains. |
OK |
Not OK |
4 |
Remove all the protection tapes which were provided before painting |
OK |
Not OK |
5 |
|
OK |
Not OK |
Remarks: |
24. CHECKLIST FOR INTERNAL PAINTING
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
26. CHECKLIST FOR VDF / TREMIX FLOORING Name Of Project : Date of Checking: Location / Fl...
No comments:
Post a Comment