11. CHECKLIST FOR HDPE MEMBRANE WATERPROOFING

 

11. CHECKLIST FOR HDPE MEMBRANE WATERPROOFING

Name Of Project :

Date of Checking:

Location / Structure:

Drawing / Document Reference No.

 

Sl.
No.

Description / Activities / Items to be Checked

Status

1

Check for the safety process is followed for waterproofing activities.

OK

Not OK

2

Check for approval of work methodology of waterproofing

OK

Not OK

3

Check for approval of Waterproofing system and materials which to be used.

OK

Not OK

PRIOR TO INSTALLATION OF PU MEMBRANE

1

Check for the availability of approval materials

OK

Not OK

2

Check if surface preparation is done as per WMS. like  dust free dry surface, repairing of surface cracks, removal of oil and other loose material, etc.

OK

Not OK

3

Check for provision of Pressure Release Pipes (PRP).

OK

Not OK

4

Check for dia. & length of Pressure Release Pipes (PRP)

OK

Not OK

5

Check aggregate or gravel provided inside PRP hole.

OK

Not OK

6

Check the mouth at the top of PRPs is covered with tough plastic to avoid entry of loose materials inside the PRP.

OK

Not OK

DURING INSTALLATION OF HDPE MEMBRANE

1

Check sandy surface layer side is up facing towards the concrete/Raft pour.

OK

Not OK

2

Check for end lapping and positioning is as per manufacturer's guideline.

OK

Not OK

3

Check continuous bond of membrane without creases.

OK

Not OK

4

Check roller is applied on joints of membrane as per manufacturer's guideline

OK

Not OK

5

Check proper jointing at junction of PRP & Membrane

OK

Not OK

AFTER INSTALLATION OF HDPE MEMBRANE

1

Check no damage during steel fixing and concreting

OK

Not OK

2

Check removal of protection tape before concrete pouring
(if protection based HDPE membrane is used)

OK

Not OK

3

Check for the termination of membrane is done as per methodology.

OK

Not OK

Remarks:

 