12. CHECKLIST FOR SBS SELF ADHESIVE
MEMBRANE WATERPROOFING |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Structure: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl. |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
for the safety process is followed for waterproofing activities. |
OK |
Not OK |
2 |
Check for approval of work methodology of waterproofing |
OK |
Not OK |
3 |
Check for approval of Waterproofing system and materials which to be
used. |
OK |
Not OK |
PRIOR & DURING INSTALLATION |
|||
1 |
Check all the construction joints and surface defects of concrete is
repaired as per methodology. |
OK |
Not OK |
2 |
Check for filling up of tie rod holes with non-shrink cementitious
grout |
OK |
Not OK |
3 |
Check the primer is applied on concrete surface before fixing of SBS
membrane |
OK |
Not OK |
4 |
Check proper Installation of membrane & it's lapping |
OK |
Not OK |
5 |
Check aluminium termination bar is provided at top to terminate the
membrane |
OK |
Not OK |
6 |
Check Sealing of termination bar with PU Sealant coating |
OK |
Not OK |
7 |
Check proper joint at corner of the wall |
OK |
Not OK |
PROTECTION OF SBS SELF ADHESIVE MEMBRANE |
|||
1 |
Check for all the joints of membrane are done properly |
OK |
Not OK |
2 |
Check for the termination of membrane is done as per methodology. |
OK |
Not OK |
3 |
Check for approval of material to be used for protection of membrane
Lke; dimple board or any suitable materials. |
OK |
Not OK |
4 |
Check and ensure no damages of membrane during fixing of protection
board. |
OK |
Not OK |
Remark: |
12. CHECKLIST FOR SBS SELF ADHESIVE MEMBRANE WATERPROOFING
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
26. CHECKLIST FOR VDF / TREMIX FLOORING Name Of Project : Date of Checking: Location / Fl...
Thanks for sharing this blog Very useful Post. Qualified flight instructors at GQ aviation flight school! Come learn to fly, earn your private pilot license Flight Schools In Pennsylvania
ReplyDeleteDurable pipeline weight bags are essential for stabilizing pipelines in challenging environments. Our Durable pipeline weight bags are designed to provide reliable anchoring, ensuring optimal performance and safety. Perfect for underwater, onshore, and offshore applications, they deliver unmatched strength and longevity.
ReplyDelete