9. CHECKLIST OF ANTI-TERMITE, RUBBLE SOLING & P.C.C. |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Grid no: |
|||
Drawing / Document
Reference No. |
|||
|
|||
Sl. No. |
Description / Activities / Items to be Checked |
Status |
|
1 |
Check
the safety process is followed for the activities. |
OK |
Not OK |
APPLICATION OF ANTI-TERMITE |
|||
2 |
Check
work methodology is approved. |
OK |
Not OK |
3 |
Check
Anti-termite chemical is approved. |
OK |
Not OK |
4 |
Check
surface is well compacted and ready for application of anti-termite. |
OK |
Not OK |
5 |
Check
for the top level of surface maintained with respect to drawing. |
OK |
Not OK |
6 |
Check
the compacted surface is not wet before application of anti-termite chemical. |
|
|
7 |
Check
for the application of Anti-termite chemical as per manufacturer’s guideline |
OK |
Not OK |
8 |
Check
for the application of Anti-termite chemical below plinth beam as per
manufacturer’s guideline |
OK |
Not OK |
LAYING OF RUBBLE SOLING |
|||
9 |
Check
marking for top level of rubble soling is done with respect to drawing |
OK |
Not OK |
10 |
Check
approval of stone to be used for rubble soling |
OK |
Not OK |
11 |
Check
for approved site of stone for rubble soling |
OK |
Not OK |
12 |
Check
for Rubble soling well placed and packed. |
OK |
Not OK |
13 |
Check
for height of Rubble soling as per specification. |
OK |
Not OK |
14 |
Check
for Ramming with proper tools. |
OK |
Not OK |
15 |
|
OK |
Not OK |
LAYING OF P.C.C |
|||
16 |
Check
for Button marking for PCC thickness. |
OK |
Not OK |
17 |
Check
for Marking of top levels of concrete with respect to drawing |
OK |
Not OK |
18 |
Check
for Form work as per dimension. |
OK |
Not OK |
19 |
Check
for availability of adequate concrete raw materials. |
OK |
Not OK |
20 |
Check
for Aggregate test report. (Fine aggregates/Cement /Water) |
OK |
Not OK |
21 |
Check
proper compaction of PCC during concreting |
OK |
Not OK |
22 |
Check
for top finished level. |
OK |
Not OK |
23 |
Check
for curing at least 7days. |
OK |
Not OK |
24 |
|
OK |
Not OK |
Remark: |
9. CHECKLIST OF ANTI-TERMITE, RUBBLE SOLING & P.C.C.
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-