16. CHECKLIST OF GYPSUM PLASTER WORK

 

16.       CHECKLIST OF GYPSUM PLASTER WORK

Name Of Project :

Date of Checking:

Location / Grid no:

Drawing / Document Reference No.

 

Sl.
No.

Description / Activities / Items to be Checked

Status

1

Check for the safety process is followed for gypsum plaster activities.

OK

Not OK

PRIOR TO PLASTER WORK

2

Check for approval of work methodology for gypsum plaster work

OK

Not OK

3

Check for Suitability & Safety of Scaffolding for gypsum plaster work

OK

Not OK

4

Check for availability of Tool and tackles for gypsum plaster work

OK

Not OK

5

Check for approval of material to be used for gypsum plaster work

OK

Not OK

6

Check for availability of materials for gypsum plaster work.
Like; Gypsum, bonding agent, fibre mesh, etc..

OK

Not OK

7

Check for cleanliness of concrete & masonry surface where gypsum plaster work to be executed

OK

Not OK

8

Check for hacking is done on RCC surface / application of bonding agent on RCC surface.
(Bonding agent must be applied at least 24 hrs before)

OK

Not OK

9

Check for fixing of GI / Fibre mesh at the joint of RCC & masonry work.

OK

Not OK

10

Check for fixing of Door & Window frames and it's protection.

OK

Not OK

11

Check for the making of level pads and its spacing.

OK

Not OK

12

Check for completion of MEP activities before start of gypsum Plastering.

OK

Not OK

13

Check for proper protection of MEP items before start of gypsum Plastering activities.

OK

Not OK

14

 

OK

Not OK

DURING GYPSUM PLASTER WORK

15

Check for mix proportion of gypsum powder as per guideline.

OK

Not OK

16

Check for true level surface, right angle, plumb, edge, sharp corners.

OK

Not OK

17

Check for architectural features like grooves, bands etc. on wall.

OK

Not OK

18

Check for Waviness of gypsum plastered surface.

OK

Not OK

19

Check for Straightness of Edges of gypsum plaster surface.

OK

Not OK

20

Check for Right Angles & Plumb of gypsum plaster surface.

OK

Not OK

21

 

OK

Not OK

AFTER GYPSUM PLASTERING

22

Check for Removal of waste gypsum & Debris

OK

Not OK

23

Check for cleanliness of MEP items, door & window frames, etc.

OK

Not OK

24

 

OK

Not OK

25

 

OK

Not OK

Remark:

 