16. CHECKLIST OF GYPSUM PLASTER
WORK |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Grid no: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl. |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
for the safety process is followed for gypsum plaster activities. |
OK |
Not OK |
PRIOR TO PLASTER WORK |
|||
2 |
Check for approval of work methodology for gypsum plaster work |
OK |
Not OK |
3 |
Check for Suitability & Safety of Scaffolding for gypsum plaster
work |
OK |
Not OK |
4 |
Check for availability of Tool and tackles for gypsum plaster work |
OK |
Not OK |
5 |
Check for approval of material to be used for gypsum plaster work |
OK |
Not OK |
6 |
Check for availability of materials for gypsum plaster work. |
OK |
Not OK |
7 |
Check for cleanliness of concrete & masonry surface where gypsum
plaster work to be executed |
OK |
Not OK |
8 |
Check for hacking is done on RCC surface / application of bonding
agent on RCC surface. |
OK |
Not OK |
9 |
Check for fixing of GI / Fibre mesh at the joint of RCC & masonry
work. |
OK |
Not OK |
10 |
Check for fixing of Door & Window frames and it's protection. |
OK |
Not OK |
11 |
Check for the making of level pads and its spacing. |
OK |
Not OK |
12 |
Check for completion of MEP activities before start of gypsum
Plastering. |
OK |
Not OK |
13 |
Check for proper protection of MEP items before start of gypsum
Plastering activities. |
OK |
Not OK |
14 |
|
OK |
Not OK |
DURING GYPSUM PLASTER WORK |
|||
15 |
Check for mix proportion of gypsum powder as per guideline. |
OK |
Not OK |
16 |
Check for true level surface, right angle, plumb, edge, sharp corners. |
OK |
Not OK |
17 |
Check for architectural features like grooves, bands etc. on wall. |
OK |
Not OK |
18 |
Check for Waviness of gypsum plastered surface. |
OK |
Not OK |
19 |
Check for Straightness of Edges of gypsum plaster surface. |
OK |
Not OK |
20 |
Check for Right Angles & Plumb of gypsum plaster surface. |
OK |
Not OK |
21 |
|
OK |
Not OK |
AFTER GYPSUM PLASTERING |
|||
22 |
Check for Removal of waste gypsum & Debris |
OK |
Not OK |
23 |
Check for cleanliness of MEP items, door & window frames, etc. |
OK |
Not OK |
24 |
|
OK |
Not OK |
25 |
|
OK |
Not OK |
Remark: |
16. CHECKLIST OF GYPSUM PLASTER WORK
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
26. CHECKLIST FOR VDF / TREMIX FLOORING Name Of Project : Date of Checking: Location / Fl...