5. CHECKLIST FOR SHUTTERING WORKS |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Grid no: |
|||
Drawing / Document
Reference No. |
|||
|
|||
Sl.No. |
Description / Activities / Items to be Checked |
Status |
|
1 |
Check the safety
process is followed for shuttering activities. |
OK |
Not OK |
2 |
Check the availability
of shuttering scheme. |
OK |
Not OK |
3 |
Check Level of
slab/beam/column/shear wall/concrete walls as per drawing. |
OK |
Not OK |
4 |
Check all the
shuttering plates /plywood cleaned properly. |
OK |
Not OK |
5 |
Check type of oil
used on for the surface of shuttering. |
OK |
Not OK |
COLUMN / VERTICAL MEMBRE |
|||
6 |
Check for
Stability, Safety & rigidity of assembled shutterings. |
OK |
Not OK |
7 |
Check for alignment
of all vertical members at floor level with respect to grid lines. |
OK |
Not OK |
8 |
Check plumb for
vertical members. |
OK |
Not OK |
9 |
Check right angle
and diagonals of the shuttering from top |
OK |
Not OK |
10 |
Check for adequate
supports are provided as per shuttering design. |
OK |
Not OK |
11 |
Check for adequacy
of cover block. |
OK |
Not OK |
SLAB & BEAM |
|||
12 |
Check the alignments,
level and diagonals of beam bottom & beam sides with respect to the
vertical members. |
OK |
Not OK |
13 |
Check the
verticality of beam sides and confirm slab dimensions. |
OK |
Not OK |
14 |
Check the line and
level of slab. |
OK |
Not OK |
15 |
Check for vertical
supports/cross supports/horizontal supports as per shuttering scheme. |
OK |
Not OK |
16 |
Check for
horizontal bracing in case of single/double bracing. |
OK |
Not OK |
17 |
Ensure locking of
vertical support system with vertical members. |
OK |
Not OK |
18 |
Check for sealing
of gaps, joints, holes and tie rods. |
OK |
Not OK |
DESHUTTERING |
|||
19 |
Check the require
strength is achieved |
OK |
Not OK |
20 |
Check for deshuttering
time after concreting as per specification. |
OK |
Not OK |
21 |
Check the condition
of Shuttering assembly. |
OK |
Not OK |
22 |
Are repairs required?
(If so send to shuttering yard). |
OK |
Not OK |
23 |
Clean, oil and
stack shuttering material for future use? |
OK |
Not OK |
24 |
Clean the area
after deshuttering. |
OK |
Not OK |
Remark: |
5. CHECKLIST FOR SHUTTERING WORKS
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-