19. CHECKLIST FOR FIXING OF DOOR FRAME & DOOR
SHUTTER |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Flat / Floor no: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl. |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
for the safety process is followed for fixing of door frame & door
shutter. |
OK |
Not OK |
|
|
|
|
PRIOR TO DOOR FRAME FIXING |
|||
1 |
Check for approval of work methodology for fixing of door frame &
Door Shutter |
OK |
Not OK |
2 |
Check for availability of Tool and tackles for fixing of door frame
& Door Shutter |
OK |
Not OK |
3 |
Check for density & moisture % of wooden door frame as per project
specification |
OK |
Not OK |
4 |
Check the shape & size of the door frame & shutter is made as
per architectural drawing |
OK |
Not OK |
5 |
Check for the top level of the door frame is marked on the wall |
OK |
Not OK |
FIXING OF DOOR FRAME |
|||
1 |
Check for vertical members of the door frames is rest on floor |
OK |
Not OK |
2 |
Check the verticality of the door frame member |
OK |
Not OK |
3 |
Check for right angle and diagonal alignment of the door frames |
OK |
Not OK |
4 |
Check for plumb for the Door Frame w.r.t. Masonry Opening. |
OK |
Not OK |
5 |
Check for the no. of anchor is used as per drawing |
OK |
Not OK |
6 |
Check for fastening of door frames to Walls by Screws. |
OK |
Not OK |
7 |
Check for grouting of holdfasts into wall (in case of holdfast is
used) |
OK |
Not OK |
FIXING OF WOOODEN DOOR SHUTTER |
|||
1 |
Check the type and size of shutter as per drawing. |
OK |
Not OK |
2 |
Check for the
provision and proper functioning of the door. |
OK |
Not OK |
3 |
Check for the Finish of Door shutter as per specification. |
OK |
Not OK |
4 |
Check for the Dimension of the shutter as per drawing. |
OK |
Not OK |
5 |
Check for the door shutter is according to drawing, design and
specification. |
OK |
Not OK |
6 |
Check the shutter is not damaged and Laminate is fixed properly. |
OK |
Not OK |
7 |
Check for the Finishing of shutter is up to the mark i.e. line, level
and smoothness |
OK |
Not OK |
8 |
Check size / brand / finishes of hardware fittings as per
specification |
OK |
Not OK |
9 |
Check for the screws are of proper size and tight with screwdriver not
hammered |
OK |
Not OK |
10 |
Check all fittings are fixed as per drawing / approved architect / client |
OK |
Not OK |
11 |
Check the alignment of the door shutter after fixing |
OK |
Not OK |
12 |
Check the clearance between door shutter and frame as per drawing. |
OK |
Not OK |
13 |
Check the clearance between door shutter and floor as per drawing. |
OK |
Not OK |
14 |
Check for polish / paint works completed for door frame. |
OK |
Not OK |
15 |
|
OK |
Not OK |
Remarks: |
19. CHECKLIST FOR FIXING OF DOOR FRAME & DOOR SHUTTER
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
26. CHECKLIST FOR VDF / TREMIX FLOORING Name Of Project : Date of Checking: Location / Fl...
No comments:
Post a Comment