6. CHECKLIST FOR REINFORCEMENT CUTTING, BENDING
& FIXING WORKS |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Grid no: |
|||
Drawing / Document
Reference No. |
|||
|
|||
S.No. |
Description / Activities / Items to be Checked |
Status |
|
1 |
Check
the safety process is followed for reinforcement steel activities. |
OK |
Not OK |
2 |
Check
Bar Bending Schedule (BBS) is approved prior to start cutting & bending. |
OK |
Not OK |
3 |
Check
the grade of reinforcement steel as per drawing / specification. |
OK |
Not OK |
4 |
Check
the quality approval of the reinforcement steel. |
OK |
Not OK |
5 |
Check
correct dia. & size of bar is used as per BBS. |
OK |
Not OK |
6 |
Check
no of bar is used as per BBS. |
OK |
Not OK |
7 |
Check
for correct fixing of bars as per construction drawings. |
OK |
Not OK |
8 |
Check
the lap lengths and location of the bar as per requirements. |
OK |
Not OK |
9 |
Check
the lapping are provided in staggered manner. |
OK |
Not OK |
10 |
Check
the approved grade & brand of coupler is used |
OK |
Not OK |
11 |
Check
proper fixing of Coupler (if Coupler is recommended). |
OK |
Not OK |
12 |
Check
Spacing & tied of bar as specified in drawing / BBS |
OK |
Not OK |
13 |
Check
the type & gauge of binding wire is used as per specification. |
OK |
Not OK |
14 |
Check
proper Cover to top, bottom & sides are provided as per requirement. |
OK |
Not OK |
15 |
Check
no of chairs & Spacers provided. |
OK |
Not OK |
16 |
Check
the master ring is provided as per requirements. |
OK |
Not OK |
17 |
Check
insert plates are provided as per drawing. |
OK |
Not OK |
18 |
Check
Electrical conduting activities completed. |
OK |
Not OK |
19 |
Check
other MEP works are completed. |
OK |
|
20 |
Any
other points: |
OK |
Not OK |
Remark: |
6. CHECKLIST FOR REINFORCEMENT CUTTING, BENDING & FIXING WORKS
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-