22. CHECKLIST FOR FIXING OF MS RAILING |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Flat / Floor no: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl. |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
for the safety process is followed for fixing of MS Railing. |
OK |
Not OK |
|
|
|
|
PRIOR TO FIXING OF MS RAILING |
|||
1 |
Check for approval of work methodology for fixing of MS Railing. |
OK |
Not OK |
2 |
Check for availability of Tool and tackles for fixing of MS Railing. |
OK |
Not OK |
3 |
Check for the grade of MS steel section to used fixing of MS Railing. |
OK |
Not OK |
4 |
Check the shape & size of the MS sections are cut as per drawing. |
OK |
Not OK |
5 |
Check for the top level of the MS Railing is marked on the wall. |
OK |
Not OK |
6 |
Check for the inspection of incoming materials w.r.t. approved
specification. |
OK |
Not OK |
7 |
Check for the insert plates are in place as per drawing. |
OK |
Not OK |
DURING FIXING OF MS RAILING |
|||
1 |
Check if structural steel sections, welding rods required for
fabrication are available. |
OK |
Not OK |
2 |
Check for straightening & dimension of MS members before fixing. |
OK |
Not OK |
3 |
Check for cutting of the sections is done as per drawing. |
OK |
Not OK |
4 |
Check for layout of final assembly of the MS structure w.r.t. Specification. |
OK |
Not OK |
5 |
Check for alignment, line, levels, locations, orientation of MS
structure during fixing. |
OK |
Not OK |
6 |
Check proper fixing and welding of base plates. |
OK |
Not OK |
7 |
Check for welding of MS structure is done as per drawing. |
OK |
Not OK |
AFTER FIXING OF MS RAILING |
|||
1 |
Check for alignment, line, levels, locations and orientation of MS
structure after fixing. |
OK |
Not OK |
2 |
Check for proper welding of joints are done per specification. |
OK |
Not OK |
3 |
Clearance for Painting |
OK |
Not OK |
Remarks: |
22. CHECKLIST FOR FIXING OF MS RAILING
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
26. CHECKLIST FOR VDF / TREMIX FLOORING Name Of Project : Date of Checking: Location / Fl...