25. CHECKLIST FOR EXTERNAL WALL PAINTING

 

25. CHECKLIST FOR EXTERNAL WALL PAINTING

Name Of Project :

Date of Checking:

Location / Flat / Floor no:

Drawing / Document Reference No.

 

Sl.
No.

Description / Activities / Items to be Checked

Status

1

Check for the safety process is followed for Painting activities.

OK

Not OK

PRIOR TO PAINTING

1

Check for approval of work methodology of external painting.

OK

Not OK

2

Check for availability of Tool and tackles for  external painting.

OK

Not OK

3

Check for Suitability & Safety of Scaffolding for external painting.

OK

Not OK

4

Check for the availability of approved manufacturer's specifications for painting activities.

OK

Not OK

5

Check for the approved mock-up of process & shade code.

OK

Not OK

6

Check for the surface is free from dead mortar, dust, oil, grease, etc.

OK

Not OK

7

Check for the grouting of tie patti / tie rod holes before painting.

OK

Not OK

8

Check for the repairing of RCC surface id done before painting.
(if required)

OK

Not OK

9

Check for proper protection of Plumbing & fire fighting pipelines, windows, etc external before start of painting activities to avoid paint stain.

OK

Not OK

10

Check the watering of surface before application of putty.

OK

Not OK

DURING PAINTING

Application of putty

10

Check for the proper mixing of Putty as per manufacturer guidelines.

OK

Not OK

 

Check for the proper application of 1st coat putty (i.e. Coarse / Filler putty) on external wall surface.

OK

Not OK

 

Check for the proper application of 2nd coat putty (i.e. fine putty) on 1 st coat of putty

OK

Not OK

 

Check for the putty is applied uniformly.

OK

Not OK

 

Check the time gape between two coat putty as per manufacturer guidelines.

OK

Not OK

 

Check for the sanding of putty surface before applying primer. (if applicable)

OK

Not OK

Application of Texture

 

Check the primer is applied evenly / uniformly as per requirements. (if required)

OK

Not OK

 

Check for the proper mixing of texture as per manufacturer guidelines.

OK

Not OK

 

Check the texture is applied evenly / uniformly as per requirements.

OK

Not OK

 

 

OK

Not OK

Application of Paint

 

Check the primer is applied evenly / uniformly as per requirements.

OK

Not OK

 

Check for the proper mixing of paint as per manufacturer guidelines.

OK

Not OK

11

Check for proper application of 1st coat paint as per manufacturer guidelines.

OK

Not OK

12

Check for proper application of 2nd coat paint as per manufacturer guidelines.

OK

Not OK

1

Check for time gape between 1st coat and 2nd coat of paint as per manufacturer guidelines.

OK

Not OK

2

Check for the uniform thickness of paint application.

OK

Not OK

AFTER PAINTING

1

Check for any patch mark / shade variation is visible on painted surface.

OK

Not OK

2

Check proper cleaning of surrounding surface of windows / ventilators of external wall.

OK

Not OK

3

Remove all the protection tapes which were provided before painting

OK

Not OK

4

 

 

 

5

 

 

 

Remarks:

 