25. CHECKLIST FOR EXTERNAL WALL PAINTING |
|||
Name Of Project : |
|||
Date of Checking: |
|||
Location / Flat / Floor no: |
|||
Drawing / Document Reference No. |
|||
|
|||
Sl. |
Description / Activities / Items to
be Checked |
Status |
|
1 |
Check
for the safety process is followed for Painting activities. |
OK |
Not OK |
PRIOR TO PAINTING |
|||
1 |
Check for approval of work methodology of external painting. |
OK |
Not OK |
2 |
Check for availability of Tool and tackles for external painting. |
OK |
Not OK |
3 |
Check for Suitability & Safety of Scaffolding for external
painting. |
OK |
Not OK |
4 |
Check for the availability of approved manufacturer's specifications
for painting activities. |
OK |
Not OK |
5 |
Check for the approved mock-up of process & shade code. |
OK |
Not OK |
6 |
Check for the surface is free from dead mortar, dust, oil, grease,
etc. |
OK |
Not OK |
7 |
Check for the grouting of tie patti / tie rod holes before painting. |
OK |
Not OK |
8 |
Check for the repairing of RCC surface id done before painting. |
OK |
Not OK |
9 |
Check for proper protection of Plumbing & fire fighting pipelines,
windows, etc external before start of painting activities to avoid paint
stain. |
OK |
Not OK |
10 |
Check the watering of surface before application of putty. |
OK |
Not OK |
DURING PAINTING |
|||
Application of putty |
|||
10 |
Check for the proper mixing of Putty as per manufacturer guidelines. |
OK |
Not OK |
|
Check for the proper application of 1st coat putty (i.e. Coarse /
Filler putty) on external wall surface. |
OK |
Not OK |
|
Check for the proper application of 2nd coat putty (i.e. fine putty)
on 1 st coat of putty |
OK |
Not OK |
|
Check for the putty is applied uniformly. |
OK |
Not OK |
|
Check the time gape between two coat putty as per manufacturer
guidelines. |
OK |
Not OK |
|
Check for the sanding of putty surface before applying primer. (if
applicable) |
OK |
Not OK |
Application of Texture |
|||
|
Check the primer is applied evenly / uniformly as per requirements.
(if required) |
OK |
Not OK |
|
Check for the proper mixing of texture as per manufacturer guidelines. |
OK |
Not OK |
|
Check the texture is applied evenly / uniformly as per requirements. |
OK |
Not OK |
|
|
OK |
Not OK |
Application of Paint |
|||
|
Check the primer is applied evenly / uniformly as per requirements. |
OK |
Not OK |
|
Check for the proper mixing of paint as per manufacturer guidelines. |
OK |
Not OK |
11 |
Check for proper application of 1st coat paint as per manufacturer
guidelines. |
OK |
Not OK |
12 |
Check for proper application of 2nd coat paint as per manufacturer
guidelines. |
OK |
Not OK |
1 |
Check for time gape between 1st coat and 2nd coat of paint as per
manufacturer guidelines. |
OK |
Not OK |
2 |
Check for the uniform thickness of paint application. |
OK |
Not OK |
AFTER PAINTING |
|||
1 |
Check for any patch mark / shade variation is visible on painted
surface. |
OK |
Not OK |
2 |
Check proper cleaning of surrounding surface of windows / ventilators
of external wall. |
OK |
Not OK |
3 |
Remove all the protection tapes which were provided before painting |
OK |
Not OK |
4 |
|
|
|
5 |
|
|
|
Remarks: |
25. CHECKLIST FOR EXTERNAL WALL PAINTING
Subscribe to:
Post Comments (Atom)
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
26. CHECKLIST FOR VDF / TREMIX FLOORING Name Of Project : Date of Checking: Location / Fl...
First You got a great blog .I will be interested in more similar topics. i see you got really very useful topics, i will be always checking your blog thanks. tranh decor
ReplyDelete