9. CHECKLIST OF ANTI-TERMITE, RUBBLE SOLING & P.C.C. |
|||
|
Name Of Project : |
|||
|
Date of Checking: |
|||
|
Location / Grid no: |
|||
|
Drawing / Document
Reference No. |
|||
|
|
|||
|
Sl. No. |
Description / Activities / Items to be Checked |
Status |
|
|
1 |
Check
the safety process is followed for the activities. |
OK |
Not OK |
|
APPLICATION OF ANTI-TERMITE |
|||
|
2 |
Check
work methodology is approved. |
OK |
Not OK |
|
3 |
Check
Anti-termite chemical is approved. |
OK |
Not OK |
|
4 |
Check
surface is well compacted and ready for application of anti-termite. |
OK |
Not OK |
|
5 |
Check
for the top level of surface maintained with respect to drawing. |
OK |
Not OK |
|
6 |
Check
the compacted surface is not wet before application of anti-termite chemical. |
|
|
|
7 |
Check
for the application of Anti-termite chemical as per manufacturer’s guideline |
OK |
Not OK |
|
8 |
Check
for the application of Anti-termite chemical below plinth beam as per
manufacturer’s guideline |
OK |
Not OK |
|
LAYING OF RUBBLE SOLING |
|||
|
9 |
Check
marking for top level of rubble soling is done with respect to drawing |
OK |
Not OK |
|
10 |
Check
approval of stone to be used for rubble soling |
OK |
Not OK |
|
11 |
Check
for approved site of stone for rubble soling |
OK |
Not OK |
|
12 |
Check
for Rubble soling well placed and packed. |
OK |
Not OK |
|
13 |
Check
for height of Rubble soling as per specification. |
OK |
Not OK |
|
14 |
Check
for Ramming with proper tools. |
OK |
Not OK |
|
15 |
|
OK |
Not OK |
|
LAYING OF P.C.C |
|||
|
16 |
Check
for Button marking for PCC thickness. |
OK |
Not OK |
|
17 |
Check
for Marking of top levels of concrete with respect to drawing |
OK |
Not OK |
|
18 |
Check
for Form work as per dimension. |
OK |
Not OK |
|
19 |
Check
for availability of adequate concrete raw materials. |
OK |
Not OK |
|
20 |
Check
for Aggregate test report. (Fine aggregates/Cement /Water) |
OK |
Not OK |
|
21 |
Check
proper compaction of PCC during concreting |
OK |
Not OK |
|
22 |
Check
for top finished level. |
OK |
Not OK |
|
23 |
Check
for curing at least 7days. |
OK |
Not OK |
|
24 |
|
OK |
Not OK |
|
Remark: |
|||
9. CHECKLIST OF ANTI-TERMITE, RUBBLE SOLING & P.C.C.
Subscribe to:
Post Comments (Atom)
-
METHODOLOGY / PROCEDURE OF CONVENTIONAL SHUTTERING & CONCRETING WORK TERMINOLOGY OF FORMWORK : Ø Formwork (Shuttering ) ...
-
CONTENT SL NO TYPES OF WATERPROOFING AREA OF APPLICATION ...
-
23. CHECKLIST FOR FIXING OF FALSE CEILING Name Of Project : Date of Checking: Location / ...
Quality insulation materials play a crucial role in industrial and commercial applications where durability and thermal resistance matter. Choosing the right supplier ensures long-term performance and cost efficiency. Many builders and contractors prefer reliable PE Insulation Sheet manufacturers because of their consistent product standards, moisture resistance, and lightweight structure. These sheets are widely used in packaging, construction, and insulation projects, making them a smart choice for businesses seeking dependable insulation solutions.
ReplyDelete